Products
Built for excavators, loaders, tracked equipment, and heavy-duty contractor vehicle access.
This page is aimed at temporary road mats, construction road mats, and temporary roadway mats searches where users are looking for a more route-focused access system.
Compared with broader ground protection searches, this landing page should clearly emphasize main routes, heavy traffic lanes, unloading zones, and turning-area reinforcement.
Beyond overall route length, the key question is whether turning zones, waiting areas, and unloading points need denser or stronger coverage.
If the main route carries repeated heavy traffic, a more stable heavy-duty roadway mat format usually needs to lead the plan.
Projects do not evaluate load support alone; they also compare deployment speed, removal efficiency, and logistics practicality.
Product description
Creates reliable temporary access routes for heavy trucks, loaders, and construction equipment.

Size
3000 x 2500 mm
Load
Up to 150 tons static load
Thickness
40 mm
Material
composite
Product description
Suitable for lighter vehicles, maintenance works, and short-term event access lanes.

Size
2440 x 600 mm
Load
Up to 40 tons static load
Thickness
15 mm
Material
hdpe
Best suited to solar, infrastructure, and larger construction sites that need a continuous equipment route.
When loose ground or wet-season conditions drive the need, this page is better aligned with true roadway-system purchasing intent.
A good fit for plans that stabilize the main route first and then reinforce unloading, turning, and waiting nodes.
Once the product direction is clear, these application pages help with deployment logic and jobsite fit.
These articles add context for material choice, sizing decisions, and project planning.
Yes. We support pallet packing, container loading plans, labeling requirements, and standard export documentation.
Standard models typically ship in 2 to 4 weeks depending on volume, customization, and factory scheduling.
We can provide placement guidance, outrigger load-spreading advice, and handling recommendations to help field teams deploy quickly.
Normally a water rinse plus periodic checks around edges, handles, and fixing points is sufficient. Store flat or evenly stacked to avoid long-term point loading.
Yes. Sample approval and key-parameter verification can be arranged before bulk purchasing.
FEIERFEI
Share equipment type, maximum load, ground condition, and quantity, and we will recommend a more practical specification for your project.
Project inquiries answered within 24 hours